Select Stations to Find Your Route

Sahibabad RRTS to Mohan Estate Metro Route

Fare & Timings

Normal Fare: ₹103
NCRTC ₹60 DMRC ₹43
Smart Card Fare: ₹93
First Train: 06:31 AM
Last Train: 10:26 AM
Powered by ixigo
17 Stations 2 Interchanges 30.4 Km 0 hrs 55 mins Moderate Route
Starts here
Line 1 Line • Platform 2 • Towards New Ashok Nagar RRTS
Change here
Pink Circular Line • Platform 2 • Via Yamuna Vihar
Change here
Violet Line • Platform 1 • Towards Raja Nahar Singh Ballabhgarh
Lajpat Nagar Metro Station connects Violet Line and Pink Line through a concourse-level corridor
Ends here
Exit
17 Stations 2 Interchanges 30.4 Km 0 hrs 57 mins Moderate Route
Starts here
Line 1 Line • Platform 2 • Towards New Ashok Nagar RRTS
Change here
Pink Circular Line • Platform 2 • Via Yamuna Vihar
Change here
Violet Line • Platform 1 • Towards Raja Nahar Singh Ballabhgarh
Ends here
Exit
View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan

Route Summary

How to reach Mohan Estate from Sahibabad RRTS by metro? : Board the metro from Sahibabad RRTS station and travel through 17 intermediate metro stations. During the journey, you will need to change trains at 2 interchange stations before reaching Mohan Estate.

The approximate travel time between Sahibabad RRTS and Mohan Estate is 0 hrs 57 mins. The total distance covered on this metro route is 30.4 Km. The first metro from Sahibabad RRTS departs at 06:31 AM, while the last train leaves at 10:26 AM.

The estimated metro fare for this route is ₹103. Smart card users may receive discounted fares. Parking facilities are available at both metro stations.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

Travel Mode Estimated Cost Savings vs Metro
🚇 Metro ₹103
🏍 Bike ₹263 ₹160 more
🛺 Auto ₹395 ₹292 more
🚕 Cab ₹648 ₹545 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

Travel Period Cash Fare Smart Card
Daily ₹206 ₹185
Weekly (5 Days) ₹1030 ₹927
Weekly (6 Days) ₹1236 ₹1112
Weekly (7 Days) ₹1442 ₹1298
Monthly (20 Days) ₹4120 ₹3708
Monthly (24 Days) ₹4944 ₹4450
Monthly (28 Days) ₹5768 ₹5191

Taking this metro ride means

  • 🌱 Estimated Carbon Saving: 4.59 kg CO₂
  • ⛽ Fuel Saving (Petrol): 2.03 litres
  • ⏱ Time Saving in Rush Hour: 35.9 minutes
  • 🔥 Calories Burned: ~35 kcal

Safety Tips

  • Beware of pickpockets.
  • Don’t use mobile while onboard/deboard.
  • Don’t use mobile at coach gates.
  • Don’t force open the coach doors.
  • Avoid personal conversations with strangers.

Share route info feedback

Address
Madan Mohan Malviya Marg, PIR Colony, Sahibabad Industrial Area Site 4, Vasundhara, Ghaziabad, Uttar Pradesh 201010
Network & Line
Delhi Meerut RRTS Metro / Line 1
Contact
9289928704
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

Sahibabad Gaon, PIR Colony, Friends Colony, Sector 6 Vasundhara

STATION AMENITIES
Parking
Divyang Friendly
Sulabh Toilet
STATION GATES
Gate no. Way to/from Divyang
1Towards Delhi end on road going to Mohan Nagar
2Towards Meerut end on road going to Mohan Nagar
3Towards Delhi end on road going to Delhi, near Shri Digambar Jain Mandir
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday10 min15 min
Saturday10 min15 min
Sunday10 min15 min

Address
Block B, Mohan Cooperative Industrial Estate, Badarpur, New Delhi, Delhi 110076
Network & Line
Delhi Metro / Violet
Contact
8800793230
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

Aali gaon, Tekhand, Mavi Mohalla, Tekhand village, Lalu Colony

STATION AMENITIES
Parking
Divyang Friendly
Sulabh Toilet
STATION GATES
Gate no. Way to/from Divyang
1Sarita Vihar Depot, AALI GAON, NIIT Technologies
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday3 min 24 sec4 min 45 sec
Saturday4 min 00 sec5 min 16 sec
Sunday5 min 10 sec5 min 10 sec

Metro Routes FAQs

𝒜. The first metro from Sahibabad RRTS is at 06:31 AM and the last metro is at 10:26 AM

𝒜. The travel distance is approx 30.4 Km KM

𝒜. There are 17 stations on this route.

𝒜. Approx travel time: 0 hrs 55 mins

𝒜. Yes, paid parking is available.

𝒜. Yes, feeder buses operate approx 06:00 AM – 10:00 PM (paid separately).

Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet.
Tap Save Route on any route page.