Select Stations to Find Your Route

Lucknow Metro

Lucknow Metro Red Line

Operator: Uttar Pradesh Metro Rail Corporation (UPMRC)

Total Stations

21 Active / 1 Inactive

Line Length

22.8 km

Line Status

Active
The Red Line is a metro line of the Lucknow Metro, a rapid transit system in Lucknow, India. It consists of 21 active stations of all Lucknow Metro network. Explore Red Line metro route details, also stations list, route map, interchange, fares, time and distance between source and destination, and top attractions nearby etc. YoMetro helps you with information about the Lucknow Metro route, first/last train timings, metro route map, fare chart, interchange, top tourist attractions near a metro station, metro news and more.

Lucknow Metro Red Line Station List

Status legend: Parking Feeder Bus Bank ATM Sulabh/Restroom

Under Construction / Planned Station

No station under-construction or planned for construction.

Lucknow Metro Red Line Map 2026

View the updated Red Line map of Lucknow Metro, featuring active stations, under-construction stations, interchanges, and the metro Red line route.

View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan

Lucknow Metro Red Line History, Facts and Expansion Plan

Get insights about the history, facts, and expansion plans of the Lucknow Metro Red Line, including details about its development, infrastructure growth, and future improvements in connectivity.

  • Lucknow Metro Line 1, also known as North–South Corridor, is a rapid transit line of Lucknow Metro.
  • This line connects Chaudhary Charan Singh Airport in the south to Munshi Pulia in the north, covering a distance of approximately 22.87 kilometres.
  • Line 1 has a total of 21 stations, including Transport Nagar, Krishna Nagar, Alambagh, Hazratganj and Charbagh.
  • Lucknow Metro Line 1 was inaugurated on September 5, 2017 by the then Chief Minister of Uttar Pradesh, Yogi Adityanath.
  • The line initially operated with Alstom Metropolis trains, which are air-conditioned and designed for rapid transit systems.
  • Lucknow Metro train has four coaches and its maximum speed is 90 km/hr.
  • During peak hours, the metro service operates at a remarkably low speed, with trains available every 5 minutes and 30 seconds.

Lucknow Metro Red Line Extension in Phase I

The Uttar Pradesh government is working on a plan to extend the Red Line of the Lucknow Metro. On one side, the line will extend from CCS Airport to Sanjay Gandhi Postgraduate Institute of Medical Sciences (SGPGI), and on the other side, it will run from Munshipulia to Indian Institute of Management (IIM) Lucknow. After completion, the corridor will cover a total distance of 23 km, connecting Amausi Airport to Munshipulia. The extension will include 22 stations, of which 19 will be elevated and 3 underground.

Lucknow Metro Red Line FAQs

Find answers to common Red Line FAQs of Lucknow Metro, covering stations, interchange points with other lines, timings, travel durations etc.

The Red Line of Lucknow Metro has 21 stations. The Red Line is approximately 22.87 km long which connects Chaudhary Charan Singh International Airport to Munshipulia.

Charbagh railway station on the Lucknow Metro Red Line serves as an interchange, connecting the metro system to Lucknow Charbagh railway station.

Yes, the Lucknow Metro Red Line is operational today. It runs as per its scheduled time. However, for any updates regarding delays or maintenance work, it is advisable to check the official website or app of Uttar Pradesh Metro Rail Corporation (UPMRC).

Lucknow Metro Red Line Timings

Lucknow Metro Red Line runs on regular schedule throughout the week between CCS Airport and Munshipulia.

Lucknow Metro Red Line Timings from Monday to Saturday:

  • First train: 06:00:00 AM CCS Airport to Munshipulia) | 06:00:00 AM (Munshipulia to CCS Airport)
  • Last train: 22:00:00 PM

Lucknow Metro Red Line Timings on Sunday:

  • First train: 06:00:00 AM CCS Airport to Munshipulia) | 06:00:00 (Munshipulia to CCS Airport
  • Last train: 22:30:00 PM

Charbagh metro station on the Red Line of the Lucknow Metro is connected to the Indian Railways, which provides access to Lucknow Junction railway station.

To go from Charbagh to Krishna Nagar, take a train from Charbagh station on the Lucknow Metro Red Line and get down at Krishna Nagar station. It is on a direct line and is very easy to travel from.

To go to Lucknow Airport (CCS International Airport), take the Red Line metro from Charbagh Metro Station and go straight to Chaudhary Charan Singh International Airport Metro Station. This is the last station on the Red Line, and the journey takes about 20 minutes.

The nearest metro station to Chaudhary Charan Singh International Airport (CCS Airport) is CCS Airport Metro Station, which is the last station of the Lucknow Metro Red Line. It is directly connected to the airport terminal, so passengers can easily use the metro.

The Uttar Pradesh Metro Rail Corporation (UPMRC) has proposed to extend the existing Red Line from Munshipulia to Jankipuram, covering a distance of 6.450 km.

Lucknow Red Line Metro News & Updates

Get the news and updates for Red Line of Lucknow Metro, including operational changes, expansion plans, station upgrades, and key announcements for commuters in Lucknow.

  • 2026-02-17 - Lucknow Metro on Monday launched a QR-code based ticketing system, which will enable commuters to book tickets directly from their mobile phones and travel conveniently on the metro network. Under the new system, commuters can purchase QR tickets through the official mobile app of Lucknow Metro, which is available on both Android and iOS platforms. The digital QR ticket generated through the app can be scanned at the yellow striped Automatic Fare Collection (AFC) gates.

  • 2026-02-01 - The second phase of the Lucknow Metro has received a major boost with the allocation of Rs 1,450 crore for the project in the Union Budget 2026-27, paving the way for construction work to begin in the coming months. Officials expect work on the Charbagh-Basant Kunj corridor to begin within three months, and tenders have already been finalized. The Phase II (Phase-1B) corridor will cover a distance of 11.16 kilometers from Charbagh to Basant Kunj. The corridor will have 12 stations, including seven underground and five elevated stations.

  • 2026-01-05 - उत्तर प्रदेश मेट्रो रेल कॉर्पोरेशन (UPMRCL) ने लखनऊ मेट्रो के फेज़ 1B के लिए सिविल कॉन्ट्रैक्ट के लिए टेंडर मंगाए हैं। कॉन्ट्रैक्ट में ठाकुरगंज मेट्रो स्टेशन से वसंत कुंज मेट्रो स्टेशन (स्टेशन सहित लगभग 4.6 km लंबाई) तक मेन लाइन एलिवेटेड वायडक्ट का डिज़ाइन और कंस्ट्रक्शन शामिल है, जिसमें वायडक्ट और डिपो के एंट्री/एग्जिट पॉइंट को जोड़ने वाले रैंप (लगभग 740.00 m) का कंस्ट्रक्शन, और ठाकुरगंज, बालागंज, सरफराजगंज, मूसाबाग और वसंत कुंज नाम के पांच एलिवेटेड मेट्रो स्टेशन बनाना शामिल है। इसमें सिविल काम, उससे जुड़े सहायक स्ट्रक्चर, PEB स्ट्रक्चर, आर्किटेक्चरल काम, पानी की सप्लाई, सफाई, ड्रेनेज, बाहरी डेवलपमेंट, फायर फाइटिंग, और रिपेयर और मेंटेनेंस का काम शामिल है। यह काम लखनऊ, उत्तर प्रदेश, भारत में लखनऊ मेट्रो के फेज़ 1B के तहत किया जाएगा।

  • 2025-12-30 - लखनऊ मुंशी पुलिया से एयरपोर्ट जाने वाली एक मेट्रो सेवा के ब्रेक अचानक जाम हो गए। इस कारण मेट्रो में सवार यात्रियों में हड़कंप मच गया। सूचना मिलते ही मेट्रो की तकनीकी टीम मौके पर पहुंची और करीब 15 मिनट की मशक्कत के बाद जाम ब्रेक को मैन्यूअल तरीके से रिलीज किया। मेट्रो अधिकारियों के मुताबिक तकनीकी समस्या के कारण ब्रेक जाम हुए थे। इस कारण 15 मिनट यह मेट्रो सेवा प्रभावित हुई। इस बीच दूसरी मेट्रो सेवाओं को दूसरे प्लेटफार्म पर चलाया गया।

  • 2025-12-03 - The Uttar Pradesh Metro Rail Corporation (UPMRC) has announced an ambitious plan to develop a massive 1,575-kilometer metro network across Uttar Pradesh by 2047. UPMRC Managing Director Sushil Kumar unveiled the comprehensive blueprint during the "Developed Uttar Pradesh for Developed India @ 2047" seminar. The initial phase will focus on expanding the metro system in the state's three established metro cities, with 225 kilometers planned for Lucknow, 200 kilometers for Kanpur, and 100 kilometers for Agra. Additionally, the plan proposes a 150-kilometer network each in Noida-Greater Noida, Varanasi, and Prayagraj. 50 kilometers of metro network are planned in key districts such as Gorakhpur, Ayodhya, and Meerut. Approximately 790 kilometers of this metro infrastructure is targeted to be completed by 2035. Emphasizing the project's financial viability, Kumar stated that the state government's annual contribution for the initial 525 kilometers of expansion will be ₹1,040 crore.

Top Attractions covered by Lucknow Metro Red Line

Explore top tourist attractions, popular monuments, cultural sites, and landmarks near the Lucknow Metro Red Line, that easily accessible via Lucknow Red Line metro.

course

Dream World Amusement Park

  • Fun and Activity
0.0 (0)
Free Entry
course

Hazratganj Market

  • Shopping Place
0.0 (0)
Free Entry
course

Tomb of Saadat Ali Khan

  • Monument
0.0 (0)
Free Entry
course

Ramakrishna Math

  • Religious Place
0.0 (0)
Free Entry
course

Kukrail Forest

  • Nature Sites and Parks
0.0 (0)
Free Entry
course

Bhootnath Temple

  • Religious Place
0.0 (0)
Free Entry
4.8k views . 🙏 Happy Journey. Safe Journey.
Was this page helpful?
0 people found this helpful